成人X站

CHOKEPOINTS

New exit from 520 bridge opens to the public

Jul 17, 2017, 6:21 AM | Updated: 9:15 am

YouTube video

Drivers who exit the 520 bridge at Montlake have a new exit.

Westbound State Route 520 drivers who exit at Montlake need to be prepared to do so much earlier on the new span, which connects the floating bridge to Montlake.

RELATED: New I-5 lanes open near notorious Tacoma Dome crawl

The exit is about a mile back from where you would expect it.

“You’ll be much higher than you were before, in fact, you won’t be able to see the exiting cars, you’ll just be going westbound on this new structure for about a mile and then you’ll still have the option of going to East Lake Washington Boulevard or Montlake,” said Washington State Department of Transportation spokesperson Steve Peer.

If you miss this new exit, you will have to detour all the way to Roanoke or I-5.

“You will have to get off at Roanoke and turn around, luckily there won’t be any new tolls, but it’s going to be a pain and you don’t want to do that,” Peer said.

This configuration will last about a month or so before the westbound span opens to all westbound traffic. That will make three lanes between I-405 and Montlake in that direction, but it won’t last long.聽 That new span will go back down to two lanes in the westbound direction in about a year. That’s when the eastbound lanes will share that new span until the new eastbound span is complete. That should take four or five years.

And we’re just getting going on the 520 construction.

“It could be a decade,” Peer said of how long we still have before this 520 project is complete. “A lot of people, when we opened the floating bridge, said, ‘Oh, 520 is done,’ and really we’re just beginning.”

There is a laundry list of items left to finish before WSDOT puts a bow on 520. The entire Montlake interchange is going to be redone, including a lid over the roadway and a new pedestrian path connecting to the arboretum. The state still needs to build new bridges over Portage Bay to connect Montlake to I-5. That will finally extend three lanes all the way from I-405 to I-5, which will also include a new lid at Roanoke.

The final piece will be a new Montlake drawbridge over the cut. It will be built next to the existing one, and each span will handle one direction of traffic.

Tell Chris about a Chokepoint or ask a traffic question via Twitter.

Chokepoints

I-90 fatal crash...

MyNorthwest Staff

WB I-90 reopens near SR 18 after driver allegedly runs down pedestrian

Washington State Patrol (WSP) has arrested a 42-year-old man after troopers say he hit and killed a 66-year-old while driving impaired near SR 18 on I-90.

2 days ago

Ship Canal Bridge...

Chris Sullivan

Ship Canal Bridge construction could mess with your weekend plans

Prepare for lane closures on the Ship Canal Bridge this weekend.

3 days ago

HOV lane violator...

Julia Dallas

Nice try: WSP busts driver using Halloween decoration in HOV lane

Washington State Patrol catches HOV lane violator using a spooky dummy for a fake passenger in a creative enforcement tactic.

3 days ago

when to renew Washington boat decals...

Nate Connors

Ahoy, matey! Time to renew those Washington boat decals

Discover when to renew Washington boat decals and ensure your vessel remains compliant with state regulations.

4 days ago

snohomish county bridge...

Chris Sullivan

Two Snohomish County bridges to close for four months

A popular shortcut between Bothell and Lynnwood is going to be shut down for several months as Snohomish County replaces an old wooden bridge.

5 days ago

toll rates sr 99 tunnel...

Frank Sumrall

SR 99 tunnel tolls increasing July 1: Here鈥檚 how much more you鈥檒l pay

The Washington State Transportation Commission is increasing the toll rates on the State Route 99 tunnel in Seattle by 3%.

5 days ago

New exit from 520 bridge opens to the public