³ÉÈËXÕ¾

CHOKEPOINTS

Plan for traffic: WSDOT’s Thursday overnight work includes full SR 167 closure

Mar 27, 2025, 4:30 PM | Updated: 4:40 pm

Thursday overnight work...

Outline of SR 167 Corridor Improvements Project. (Image courtesy of WSDOT)

(Image courtesy of WSDOT)

The Washington State Department of Transportation (WSDOT) will install sign bridges and toll structures on State Route 167 (SR 167). This work needs a full closure of the highway between 277th Street and West Willis Street/State Route 516 (SR 516) in both directions of SR 167. This 1.5-mile section will close Thursday at 10 p.m. through Friday at 4 a.m., with a detour in place.

Once complete, this will be part of the long-term plan to connect a 50-mile express toll-lane system between Lynnwood and Puyallup. This work is part of the

The following on- and off-ramps will also be closed:

  • West Willis Street/SR 516 on-ramp to southbound SR 167.
  • South 277th Street on-ramp to northbound SR 167.
  • Northbound SR 167 off-ramp to West Willis Street/SR 516.
  • Southbound SR 167 off-ramp to South 277th Street.

WSDOT crews will remove signs from Interstate 405 (I-405) southbound through Canyon Park, part of the .

Expect intermittent full I-405 closures during WSDOT’s Thursday overnight work

The plan is to have as little impact to drivers as possible, with lane closures beginning Thursday at 8 p.m. approaching State Route 527 (SR 527). At midnight, contractors will have intermittent full closures on I-405 to safely remove signs over the freeway, stopping traffic for up to 15 minutes.

All lanes will reopen Friday by 4:30 a.m. WSDOT plans to have similar late-night closures in April in both directions of I-405 at different locations.

Drivers on Mercer Island will have one less option to enter Interstate 90 (I-90) east beginning Thursday at 9 p.m. Contractors will shut down the East Mercer Way on-ramp to take measurements for the set to begin this summer.

This is a short three-hour closure, reopening by midnight on Thursday.

Nate Connors is a traffic reporter for ³ÉÈËXÕ¾ Newsradio. Follow him on . Submit news tips here.

Chokepoints

southbound I-405 toll...

Jason Sutich

WSDOT investigates glitch as I-405 toll signs show ‘FREE’

The express toll lanes on southbound I-405 between Lynnwood and Bellevue were free Thursday morning due to incorrect signage labeling the lanes as "FREE."

2 hours ago

Washington speed infractions...

Jason Sutich

Work zone speed cameras catch thousands of drivers in first 90 days

The Washington State Patrol has issued 7,599 infractions for drivers speeding in road work zones across the state in the last 90 days, according to ³ÉÈËXÕ¾ 7.

5 hours ago

Sound Transit light rail...

Chris Sullivan

Sound Transit eyes march to Everett

Sound Transit is looking to extend light rail service to Everett.

7 hours ago

Northgate rollover crash...

MyNorthwest Staff

Busy intersection in Northgate back open after rollover crash

An intersection in Northgate is back open after a rollover crash.

1 day ago

Diverging Diamond Interchange...

Chris Sullivan

New interchange is open but westbound I-90 traffic likely won’t improve for months

The state's new Diverging Diamond Interchange (DDI) at SR 18 is now open and will hopefully improve traffic and safety.

2 days ago

WSDOT ratchets up its workload along sections of US 2 near Stevens Pass Summit (Image courtesy of W...

Nate Connors

Multiple projects underway on US 2 between Stevens Pass and Coles Corner

Beginning Tuesday, crews will be working on pavement repairs along a 4-mile section just west of the summit, near Deception Falls.

3 days ago

Plan for traffic: WSDOT’s Thursday overnight work includes full SR 167 closure